الانتقال إلى المحتوى

Off-plan buildings in Al Barari

3 buildings in Al Barari are still being built. Each shows its developer, handover date and how far construction has got.

Showing 1–3 of 3

  • The Cape Tower A, Wadi Al Safa 3على المخطط

    The Cape Tower A

    Wadi Al Safa 3 · Abwab

    Handover 31 Dec 2028 · 1% built

  • The Cape Tower B, Wadi Al Safa 3على المخطط

    The Cape Tower B

    Wadi Al Safa 3 · Abwab

    Handover 31 Dec 2028 · 1% built

  • The Cape Tower C, Wadi Al Safa 3على المخطط

    The Cape Tower C

    Wadi Al Safa 3 · Abwab

    Handover 31 Dec 2028 · 1% built

تواصل معنا عبر WhatsApp