الانتقال إلى المحتوى

Off-plan buildings in Bukadra

29 buildings in Bukadra are still being built. Each shows its developer, handover date and how far construction has got.

Showing 25–29 of 29

  • The Highgrove, Bukadraعلى المخطط

    The Highgrove

    Bukadra · Ellington

    Handover 31 Dec 2028 · 7% built

  • The Winslow, Bukadraعلى المخطط

    The Winslow

    Bukadra · Invest Group Overseas

    Handover 30 Jun 2028 · 0% built

  • Zen Lagoons, Bukadraعلى المخطط

    Zen Lagoons

    Bukadra · Sanzen Developments

    Handover 30 Jun 2029 · 0% built

تواصل معنا عبر WhatsApp