الانتقال إلى المحتوى

Off-plan buildings in Al Barsha South Third

33 buildings in Al Barsha South Third are still being built. Each shows its developer, handover date and how far construction has got.

Showing 25–33 of 33

  • The Lx, Al Barsha South Thirdعلى المخطط

    The Lx

    Al Barsha South Third · Mulk Properties

    Handover 30 Aug 2027 · 5% built

  • Trinity By Karma, Al Barsha South Thirdعلى المخطط

    Trinity By Karma

    Al Barsha South Third · Karma Realty

    Handover 1 Dec 2026 · 31% built

  • Vertex Pointe, Al Barsha South Thirdعلى المخطط

    Vertex Pointe

    Al Barsha South Third · Aum One

    Handover 15 Nov 2027 · 0% built

  • Vincitore Volare, Al Barsha South Thirdعلى المخطط

    Vincitore Volare

    Al Barsha South Third · Vincitore

    Handover 1 Jun 2025 · 63% built

تواصل معنا عبر WhatsApp