Перейти к содержимому

Off-plan buildings in Wadi Al Safa 4

52 buildings in Wadi Al Safa 4 are still being built. Each shows its developer, handover date and how far construction has got.

Showing 49–52 of 52

  • Serra Tower 6, Wadi Al Safa 4Недвижимость на стадии строительства

    Serra Tower 6

    Wadi Al Safa 4 · Majid Al Futtaim

    Handover 30 Nov 2027 · 42% built

  • Serra Tower 7, Wadi Al Safa 4Недвижимость на стадии строительства

    Serra Tower 7

    Wadi Al Safa 4 · Majid Al Futtaim

    Handover 30 Nov 2027 · 42% built

  • Serra Tower 8, Wadi Al Safa 4Недвижимость на стадии строительства

    Serra Tower 8

    Wadi Al Safa 4 · Majid Al Futtaim

    Handover 30 Nov 2027 · 42% built

  • The Yards Plaza By Beyond, Wadi Al Safa 4Недвижимость на стадии строительства

    The Yards Plaza By Beyond

    Wadi Al Safa 4 · Beyond

    Handover 30 Sept 2029 · 0% built

Напишите нам в WhatsApp