期房Off-plan buildings in Palm Jebel Ali
9 buildings in Palm Jebel Ali are still being built. Each shows its developer, handover date and how far construction has got.
Showing 1–9 of 9
期房
期房
期房
期房Palm Jebel Ali - The Beach and Coral Collection
Palm Jebel Ali · Nakheel
Handover 4 Dec 2028 · 2% built
期房Palm Jebel Ali - The Beach and Coral Collection - Frond B
Palm Jebel Ali · Nakheel
Handover 4 Dec 2028 · 3% built
期房Palm Jebel Ali - The Beach and Coral Collection - Frond C
Palm Jebel Ali · Nakheel
Handover 4 Dec 2028 · 3% built
期房Palm Jebel Ali - The Beach and Coral Collection - Frond D
Palm Jebel Ali · Nakheel
Handover 4 Dec 2028 · 2% built
期房Palm Jebel Ali - The Beach and Coral Collection - Frond E
Palm Jebel Ali · Nakheel
Handover 4 Dec 2028 · 3% built
期房Palm Jebel Ali - The Beach And Coral Collection - Frond F
Palm Jebel Ali · Nakheel
Handover 4 Dec 2028 · 3% built