跳至内容

Off-plan buildings in Dubai Design District

7 buildings in Dubai Design District are still being built. Each shows its developer, handover date and how far construction has got.

Showing 1–7 of 7

  • Atelis At D3, Zaabeel Second期房

    Atelis At D3

    Zaabeel Second · Meraas

    Handover 14 Aug 2029 · 1% built

  • Tower A, Zaabeel Second期房

    Tower A

    Zaabeel Second · Meraas

    Handover 31 Jan 2030 · 0% built

  • Tower B, Zaabeel Second期房

    Tower B

    Zaabeel Second · Meraas

    Handover 31 Jan 2030 · 0% built

  • Tower C, Zaabeel Second期房

    Tower C

    Zaabeel Second · Meraas

    Handover 31 Jan 2030 · 0% built

通过 WhatsApp 联系我们