Jumeirah Residences - Asora Bay - Ocean Mansions
Jumeirah First · Meraas
Handover 31 Mar 2029 · 1% built
Off-plan building · Meraas
Highlights
Solaya (8,9) is a residential building in Jumeirah First, Dubai, developed by Meraas.
It is under construction, 0% complete, with handover planned for 2030. Few units have changed hands recently, so prices here are set by a small number of sales.
Solaya (8,9) is one of 40 buildings in Jumeirah First: 28 are complete and 9 are still being built.
Nearby amenities
The nearest Dubai Metro station from Solaya (8,9) is Emirates Towers (red line, 2.7 km, about 7 min drive), then World Trade Centre (red line, 2.7 km, about 7 min drive). Stations planned on new lines nearby include Al Satwa Road (golden line, 1.5 km, about 5 min drive) and Al Satwa near Satwa Bus Station (golden line, 1.5 km, about 5 min drive). Most residents will drive or take a taxi to the metro.
The closest is Jumeirah Plaza, 0.4 km from Solaya (8,9) (about 5 min walk).
The closest is Crowne Plaza Dubai, 2.3 km from Solaya (8,9) (about 7 min drive).
The closest is Jumeirah Prime Medical Center, 0.3 km from Solaya (8,9) (about 4 min walk).
The closest is Zabeel Park, 3.9 km from Solaya (8,9) (about 10 min drive).
The nearest is Jumeira Baccalaureate School, 1.5 km away. Ratings are the KHDA's latest inspection grades.
Jumeirah First has 40 buildings. A few others to compare Solaya (8,9) with:
Jumeirah First · Meraas
Handover 31 Mar 2029 · 1% built
期房
准备就绪
准备就绪
准备就绪
准备就绪常见问题
A broker who works Jumeirah First will tell you what is available and what comparable homes went for.